欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Delegation Led by Jia Baoli, the Board Chairman of Water Conservancy Construction Group, Goes to Project Department of Dredging Engineering in Bangladesh for Research Work

                                                                                             2018-04-24


From April 16 to 19, the delegation led by Jia Baoli, the Board Chairman of Water Conservancy Construction Group, went to the project department of dredging engineering in Bangladesh for research work and held the engineering symposium of "improving the seaworthiness of the river basin from Mongla to Pakshi".

The delegation led by Jia Baoli, first went to the construction site to review the construction schedule, and called on the front-line workers to inquire about the situation of their life, work and logistics support, paid special attention to their personal safety and property security, and promised the group would help to solve problems wholeheartedly. After listened to the briefing by relevant person in charge on the project construction schedule, safety production and implementation of management system, Jia Baoli highly affirmed the work of the project department of dredging engineering and the front-line construction personnel in Bangladesh.

At the meeting, Jia Baoli pointed out that the project department must make sure to complete the target plan before the flood season and proposed five requests correspondingly. He stressed that it is important to fully understand the significance of the implementation of the dredging engineering in Bangladesh. This is both the embodiment of the response to the national strategy of “the Silk Road Economic Belt and the 21st-Century Maritime Silk Road”, and also the needs of the development of firm internationalization, which plays a great role in the company brand shaping and the promotion of the position of the Company, at the same time lays a solid foundation to meet the workers' growing material needs. Second, we shall fully understand the current urgency of the dredging engineering project in Bangladesh and take effective measures to ensure the completion of construction tasks. The dredging engineering project in Bangladesh is facing the problem of limited time with heavy task, further research on current problems and difficulties before us from the organizational level should be adopted and practical implementing scheme should be formulated in combination with the actual situation of the project after seriously analyzing the causes, and a clear responsibility of relevant subjects should be defined to perfect the management system, strengthen the execution ability, vigorously pay attention to the implementation of the work, realize the overall ascension in the accumulation of the summing up experience. On the individual level, we shall obey the organization, obey the management, be united and cooperated, be brave to take the responsibility, be diligent and dedicated, and continue to work hard to ensure the success of the task. Third, we shall attach great importance to safety and prevent accidents by strengthening the education of safety awareness, improve the capability of emergency rescue in order to fully ensure the safety of personal property and the production safety. Fourth, logistics support should be well done to enrich the life of employees. The mode of flexible logistics support in the front-line combined with unified logistics support in the rear shall be carried out. Fifth, we shall establish and improve the Party organization, establish the Party branch as soon as possible, and carry out the work of Party building. Where the business goes, where the Party organization is built, make sure to adhere to the Party's leadership of all the works of the project even in foreign countries.

It is believed that a time will come to ride a long wind to break the waves and hoist up the sails to go forward in the sea. The smoothly running of the dredging engineering in Bangladesh is the result of joint efforts. SDWP will seize the trend of the world and conform to the trend of the times by continuing to explore, strengthening cooperation and striving to create a new development situation.



Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

  • <menuitem id="gycsz"><rp id="gycsz"></rp></menuitem>

        
        
        1. <p id="gycsz"></p>

          1. <bdo id="gycsz"></bdo>

            主站蜘蛛池模板: 龙里县| 水城县| 龙胜| 静海县| 温州市| 广西| 阜南县| 北海市| 宽城| 襄垣县| 陵川县| 乌鲁木齐市| 金溪县| 清苑县| 虹口区| 漳浦县| 治多县| 民县| 渭源县| 安远县| 大厂| 玉环县| 衡南县| 澄迈县| 富宁县| 康马县| 曲靖市| 雷波县| 册亨县| 新兴县| 东乡县| 榆树市| 乌鲁木齐县| 肃南| 长沙县| 宜兰县| 丹棱县| 霍邱县| 惠州市| 璧山县| 怀仁县|