欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Accelerating progress mobilization meeting in the flood season held By SDWP international company at DESWSP project in Bangladesh

                                                                                             2019-07-19


On July 8, the Bangladesh DESWSP project of SDWP international company held an accelerating progress mobilization meeting in the flood season. The meeting centered on the analysis and summary of the problems existing in the construction process at the present stage, proposition of solutions, clarification of the importance,management ideas and the emergency work task in flood season to guaranteed the construction progress.

The meeting analyzed and summarized the construction of the project cofferdam, the filling of the construction area and the management of the local labor, and put forward the following requirements for the next stage of the project management: Firstly, it is necessary to strengthen the labor management system, strictly manage the temporary local labor during the emergency period, strengthen communication and coordination among various departments and teams, feedback and communicate problems in time, and solve them in a timely manner. Secondly, it is necessary to improve the importance of safety management in the construction, especially for the site construction personnel who must wear safety hats, safety shoes and other labor protection appliances, for putting up a conspicuous warning sign at the location of the hidden danger; thirdly, each construction group is required not to stop work during the rainy season, overtime to ensure the construction progress of the project.

The meeting stressed that under the current political situation in Bangladesh, it is necessary to strengthen the safety and civilized construction and standardized construction of the project, strengthen the safety measures for projects in flood season, strengthen the monitoring of rain and water conditions, make good emergency plans, and ensure the safety of construction personnel.




Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

  • <menuitem id="gycsz"><rp id="gycsz"></rp></menuitem>

        
        
        1. <p id="gycsz"></p>

          1. <bdo id="gycsz"></bdo>

            主站蜘蛛池模板: 麦盖提县| 崇州市| 广灵县| 广宁县| 乐安县| 古浪县| 张家界市| 崇明县| 上思县| 玉门市| 吴桥县| 镇江市| 东城区| 崇明县| 冕宁县| 南康市| 松桃| 漳州市| 巧家县| 寿阳县| 利川市| 伊吾县| 章丘市| 南阳市| 邵东县| 体育| 个旧市| 岗巴县| 丰原市| 轮台县| 海晏县| 彝良县| 梧州市| 瑞金市| 平定县| 犍为县| 塘沽区| 于都县| 英德市| 阿勒泰市| 贵港市|