欧美亚洲中日韩中文字幕在线,日韩视频在线免费,亚洲午夜视频在线观看

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Xiaoqinghe flood control comprehensive treatment project (Weifang section) main works completed

                                                                                             2020-07-13

Xiaoqinghe flood control comprehensive treatment project is the "No.1 water conservancy project" determined by the provincial Party committee and the provincial government this year. Shouguang municipal Party committee and government attach great importance to the construction of Weifang section, actively coordinate and dispatch; rely on cadres to closely follow closely, and fulfill their duties; construction enterprises seize the golden season of construction, reverse the construction period, and fight with wall charts. After more than four months of concerted efforts, on July 10 Successful completion of the main project construction tasks, to achieve the flood season can block tide, flood control and drainage function, to ensure the safety of the flood season.
On the afternoon of July 10, Chai Shouzeng, member of the Standing Committee of the CPPCC municipal committee and member of the Party group, and Cui Weichuan, deputy secretary of Weifang Xiaoqinghe management office and director of the Bureau of housing and urban rural development, led the participating units to conduct a comprehensive inspection on the completion of the main works of the Xiaoqinghe flood control comprehensive treatment project, accompanied by Weifang Xiaoqinghe management office and its agent construction, supervision and monitoring.
After the inspection, a summary meeting was held. The director gave the speak. First, pay attention to the finishing work of the main project and clean up the project site as soon as possible according to the requirements of civilized construction; second, pay attention to the continuous construction work, especially the hardening of dam crest Road, the construction of hoist room and management room. Third, pay attention to the quality improvement work, the site management work should be conscientious and responsible, and the main project details should be handled. The fourth is to pay close attention to the safety production work, strengthen the "red line" consciousness, find out the potential safety hazards, deal with them in time, rectify them in time, and resolutely curb the occurrence of safety accidents; fifth, do a good job in flood control, and all construction enterprises should improve their positions to overcome the paralysis, It is necessary to prepare tons of bags, geotextiles, mobile power supply and other materials at the project site, coordinate personnel and machinery, do well in flood control preparation of this bid section, and regularly inspect flood control risk points to ensure safe flood control.



Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]

<pre id="ksndt"></pre>
<menuitem id="ksndt"></menuitem>

    主站蜘蛛池模板: 克山县| 乌拉特前旗| 桦川县| 台前县| 庆元县| 杨浦区| 恭城| 关岭| 渝中区| 石棉县| 什邡市| 乳山市| 遂宁市| 衡水市| 洪江市| 宣威市| 阿坝| 兴安盟| 连城县| 信宜市| 台江县| 巴青县| 华池县| 徐水县| 宿迁市| 汾西县| 黎平县| 汶川县| 罗山县| 蓬安县| 鄱阳县| 大宁县| 蕉岭县| 普陀区| 恩施市| 黑水县| 泸定县| 凌云县| 当阳市| 荥阳市| 大悟县|